ericmpmail-rv10(at)yahoo. Guest
|
Posted: Thu Jun 08, 2006 3:50 pm Post subject: Joined the forward and center fuselage section last night an |
|
|
I finally joined the slow build forward and center
fuselage sections. At the overlapped skin joint under
the center spars I applied ~ 120 grams of proseal in a
very thin layer. I was concerned with the possiblity
of water getting trapped between these layers and
damaging the Al.
I'm happy to say it went very smoothly and I had
plenty of time to complete all the rivets. (except ~ 4
where I will have to invent another bucking bar to get
to).
John C gave me the inspiration at the last NW RV-10
meeting and I'm glad I did it. I also plan on
prosealing the tail cone to fuselage joint and wing
walk angles. (as well as firewall)
I've also been priming with E2G973 and for the
fuselage I am also applying a two part epoxy top coat.
Another tip is after you connect the spar's with the
Al spacers you can also install the seat rails
temporarily to insure alignment. I'm still amazed that
everything lines up perfectly considering the
cumulative tolerances...
Eric
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|