aadamson(at)highrf.com Guest
|
Posted: Mon Mar 06, 2006 12:36 pm Post subject: Power reqmts - buss evaluation? |
|
|
All,
I'm looking for a little help. I've got a panel design conceptualized, as a
result I need to verify the most optimal buss, switch breaker, breaker and
fuse counts.
http://www.highrf.com/Rockets/Panel%20Final.jpg - Panel layout
I've been using a spreadsheet that includes all the information including
some tables that show busses and what's on each buss. I'm primarily focused
on pull breakers, but all the detail are there for switch breakers and
fuses.
http://www.highrf.com/Rockets/Breaker%20Counts.xls - spreadsheet
This is a dual alt/batt 24v system with a 60 or 100amp main alt, and an
SD-20 as backup. It will be using a slightly modified Z14 (modified because
there is an avionics master on the primary buss.
Please let me know if you see any "gaping" holes in my thot process. The
airplane uses a Chelton dual screen EFIS with electric instrument backup.
There is no vacuum system.
Thanks for your time and any help is appreciated.
Alan
| - The Matronics AeroElectric-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?AeroElectric-List |
|
|
|